eicrlandlord.co.uk

Your rental's electrical safety, filed and sorted.

A landlord EICR checks the fixed wiring in your rental and gives you the report the law asks for. We arrange a qualified electrician, send you the paperwork, and help you keep track of the dates: the five-year renewal, the 28-day copy to tenants, and the 28-day deadline for any repairs.

5 yrs

Maximum gap between inspections

28 days

To give tenants a copy, or to fix C1, C2 & FI items

£30k

Maximum penalty a council can impose per breach

Flat 2 · 14 Elm Road
EICR · Condition report
Rented dwelling,
2‑bed flat
Inspected
12 Mar 2026
Circuits tested
9 of 9
Consumer unit
RCBO, metal clad
Next inspection
Mar 2031
PASS
Earthing & bonding verified
PASS
RCD protection, all circuits
C3
Label outdated circuit chart
Satisfactory
Overall assessment

Copy to tenant ✓
within 28 days done 14/3!

Next due
4 yrs 5 mths
Tab 01
Your legal duties

Six dates and duties every landlord should keep on file.

The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 apply to most private tenancies in England. Every duty below comes from those regulations, written in plain English.

5
years max

Get the installation inspected and tested

Have the fixed electrical installation inspected and tested by a qualified, competent person at least every five years, or sooner if the last report says so.

Regulation 3(1)(b)
28
days

Give existing tenants a copy

Each existing tenant must receive a copy of the report within 28 days of the inspection. Email is fine if the tenant agrees to receive documents that way.

Regulation 3(3)(a)
0
days

Give new tenants a copy before they move in

A new tenant must have a copy of the most recent report before they occupy the property. Add it to your move-in pack next to the gas certificate and EPC.

Regulation 3(3)(c)
28
days

Fix C1, C2 and FI items

If the report needs remedial work or further investigation, it must be completed within 28 days, or sooner if the report gives a shorter deadline.

Regulation 3(4)
28
days

Confirm the repairs in writing

Once remedial work is done, get written confirmation from the electrician and send it, with the report, to the tenant and the local council within 28 days.

Regulation 3(5)
7
days

Show the council if they ask

The local housing authority can ask to see the report, and you have 7 days to provide it. Keep a copy to give the inspector who does the next one.

Regulation 3(3)(b) & (d)
£30,000

Councils can impose a financial penalty of up to £30,000 per breach and can arrange remedial work themselves, then recover the cost from you. Breaches can also affect HMO and selective licensing applications. The cheapest way to stay compliant is to keep the dates on file.

Tab 02
Quick check

Do the rules apply to your let?

Most private tenancies in England are covered, but some arrangements are excluded. Answer five questions for a quick indication. It isn’t legal advice, but it tells you where you stand.

Is the property in England?
Scotland and Wales have their own rules (see below).
Does the tenant live there as their only or main home and pay rent?
Includes assured shorthold tenancies, licences and HMO rooms.
Do you or your family live there and share a kitchen or bathroom with them?
This is a lodger arrangement.
Is it a long lease of 7 years or more?
Or a lease that grants the right to occupy for 7+ years.
Is it a holiday let or short-stay booking?
Guests have no tenancy and the property isn't their main home.
Our reading
Covered
Yes, you need an EICR at least every five years.

This looks like a tenancy covered by the 2020 regulations. Book an inspection if you don’t have a current report, and give each tenant a copy within 28 days.

Different rules
Check the rules where the property is.

Wales and Scotland also require EICRs every five years, under their own laws. See the summary further down this page.

Not covered
Not legally required, but strongly advised.

Holiday lets aren’t tenancies, so the 2020 regulations don’t apply. Insurers, platforms and fire risk assessments usually still expect an EICR.

Excluded
Lodger arrangements are excluded.

If you or your family live there and share facilities with your lodger, the regulations don’t apply. An EICR is still the simplest way to show the home is safe.

Excluded
Long leases of 7+ years are excluded.

Tenancies granting a right of occupation for seven years or more fall outside the 2020 regulations.

Check further
It depends on the occupation arrangement.

The rules apply where a tenant occupies the property as their only or main home and pays rent. Talk to us and we’ll help you work it out.

Other exclusions include social housing (now covered by separate rules), student halls, hostels and refuges, care homes, hospitals and hospices. If in doubt, check GOV.UK guidance or ask us.

Tab 03
Renewal planner

When is your next EICR actually due?

Enter the date of your last inspection to see where you are in the cycle, when to book, and the deadlines to note. You can also save the reminders straight to your calendar.

Date of last EICR
Interval stated on the report
Overall result
Property label (for reminders)

Nothing you enter here leaves your browser.

Next inspection due
—
On track
Last EICR
Book
Today
Due
Book by
—

8 weeks’ notice gives time for access and repairs

Tenant copy deadline
—

28 days after the inspection date

Repairs deadline
—

Only applies if the report is unsatisfactory

C1, C2 and FI items must be resolved by this date

Downloads an .ics file for Google, Outlook or Apple Calendar.

Tab 04
The inspection

What the electrician checks, room by room.

An EICR covers the fixed installation: wiring, sockets, switches, light fittings, the consumer unit and permanently connected equipment. Tap a marker to see what happens in each part of the home.

Cutaway of a rental house showing each room
Loft
Bedroom 1
Bathroom
Bedroom 2
Hall & stairs
Kitchen
Living
Marker 1 · Under the stairs
The consumer unit

The fuse board is where most testing starts. The electrician checks its condition, how it’s mounted and whether it’s suitable, then confirms every circuit has the right protection.

Tip: clear the cupboard before the visit!
Marker 2 · Kitchen
Kitchen circuits & cooker

The kitchen draws the most current, so the cooker circuit, sockets near water and any hard-wired appliances get close attention.

Pull the fridge out if you can.
Marker 3 · Bathroom
Bathrooms & special locations

Water and electricity call for tighter rules. Fittings must be suitable for their zone, and circuits must have 30mA RCD protection.

Old pull-cords get noted.
Marker 4 · Bedrooms & living
Sockets, lighting & wiring

A sample of accessories is opened to check connections, and every circuit is tested for continuity, insulation resistance and polarity.

Furniture in the way? Move it first!
Marker 5 · Loft & voids
Hidden wiring

Where it’s safe and accessible, the electrician looks at cables in the loft for damage, poor joints, rodent damage, and cables buried under insulation that could overheat.

A loft ladder saves time.
Marker 6 · Outside & intake
Meter, earthing & outdoor circuits

The electrician checks where the supply comes in, the earthing arrangement, main bonding to gas and water, and any outdoor sockets, lights or outbuildings.

Unlock the shed and meter box.
Tab 05
Reading the result

Four codes, and what each one means for you.

Each observation on the report gets a code. Any C1, C2 or FI makes the overall result unsatisfactory, and the 28-day repair clock starts from the inspection date.

C1

Danger present

A real risk of injury right now, such as exposed live parts. The electrician should make it safe before leaving, often by isolating the circuit.

Unsatisfactory · fix immediately
C2

Potentially dangerous

Not dangerous yet, but it could become so, for example missing earthing or no RCD where one is needed. Urgent remedial work is required.

Unsatisfactory · fix within 28 days
FI

Further investigation

Something couldn’t be fully assessed during the visit and could hide a fault. It has to be investigated before the report can be signed off.

Unsatisfactory · investigate within 28 days
C3

Improvement recommended

Not up to the latest standard but not unsafe, such as an older consumer unit. On its own, a C3 doesn’t fail the report.

Satisfactory · optional upgrade

Got an unsatisfactory report? You don’t have to use the same electrician for the repairs, but you do need written confirmation that the work is complete. Ask for a Minor Works or Electrical Installation Certificate for each fix, and send copies to your tenant and the council within 28 days.

Tab 06
Costs

Clear, fixed prices by property size.

An EICR is priced on the number of circuits, which follows the size of the property. These are our typical fixed prices. We confirm yours in writing before booking, with no surprises on the day.

Studio / 1-bed
£75
 – £98.99
most flats
2–3 bed
Most booked
£98.99
terraces & semis
4–5 bed
£109.99
 – £149.99
family homes

Every price includes

Inspection of all accessible circuits
✓
Full schedule of test results
✓
Digital report, ready to forward to tenants
✓
Itemised quote for any C1/C2/FI repairs
✓
Reminder before your next renewal
✓

What can change the price

Larger installations, extra distribution boards, outbuildings, poor access, or very old wiring that takes longer to test. If something comes up, we tell you before any extra work, and repairs are always quoted separately. Prices shown are a guide and depend on location and availability.

Tab 07
How it works

From enquiry to filed report.

We handle the coordination, so you aren’t stuck passing messages between the electrician and your tenant.

01

Tell us the property

Address, bedrooms, whether it’s an HMO, and who’s handling access.

2 minutes
02

Fixed price, in writing

We confirm the price and offer slots that work for you and your tenant.

same day
03

We arrange access

Tenant notice, key collection or agent handover, all agreed in advance.

we chase it
04

Inspection & testing

Power is off for short periods. The electrician tests every accessible circuit.

2–5 hours
05

Report on file

Your EICR is emailed as a PDF, ready to forward to tenants, with any repairs quoted.

within 48h
Tab 08
Free template

A tenant access notice, written for you.

Tenants usually expect at least 24 hours’ written notice before a visit. Fill in the details, copy the letter, and send it by email or text. The more notice they get, the more likely the visit goes ahead first time.

Tenant name(s)
Property address
Visit date
Arrival window
Your name

Dear {tenant},

Re: Electrical safety inspection at {address}

As your landlord, I am required by the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 to have the electrical installation in your home inspected and tested by a qualified electrician.

The inspection is booked for {weekday} {date}, with the electrician arriving between {time}. It usually takes between two and five hours.

During the visit, the power will be switched off for short periods. Please:
  • make sure the electrician can reach the fuse board, sockets and the loft if there is one
  • back up anything important on computers and switch them off safely
  • keep fridge and freezer doors closed while the power is off

You will receive a copy of the report within 28 days of the inspection.

If this time doesn’t suit you, please let me know as soon as possible so we can arrange another date.

Thank you for your help.

Kind regards,
{sender}

Copied to clipboard ✓
Tab 09
Who we help

One landlord or a whole portfolio.

The legal duty is the same. What changes is how many properties there are, who coordinates access, and how the paperwork is filed.

House icon

Single-let landlords

One property, one report, and reminders before each renewal so it doesn’t slip.

Building icon

HMO operators

Individual rooms, communal areas and landlord supplies covered, with paperwork ready for licensing.

List icon

Portfolio landlords

One booking list for many addresses, with a separate report and renewal date for each.

People icon

Letting & managing agents

We liaise with tenants directly and send reports in a consistent format for your records.

Home icon

Accidental landlords

Renting out a former home? We’ll explain what applies and what doesn’t, step by step.

Checklist icon

Pre-sale & pre-let checks

Find any repairs before a buyer’s survey or before the first tenant moves in.

Tab 10
Doing it properly

Checks worth making before anyone tests your wiring.

The regulations say the inspector must be “qualified and competent”. This is what that means in practice, and what’s different outside England.

Registered with a competent person scheme
Such as NICEIC, NAPIT or ELECSA. You can check the electrician on the scheme's public register.
Qualified in inspection and testing
For example City & Guilds 2391 or 2395, plus current BS 7671 knowledge.
Insured
Public liability and professional indemnity insurance appropriate to the work.
A full report, not a one-page "certificate"
A genuine EICR includes the schedule of inspections and test results for every circuit.
Repairs quoted separately
You decide who does the remedial work. No pressure to agree on the day.
ENG

England

2020 regulations: EICR at least every 5 years, copies to tenants within 28 days, repairs within 28 days.

WAL

Wales

Under the Renting Homes (Wales) Act, landlords need an EICR at least every 5 years for occupation contracts.

SCO

Scotland

Private landlords need an EICR every 5 years, plus PAT testing of any appliances they provide.

NI

Northern Ireland

Private tenancies require periodic electrical safety checks. Check current NI Direct guidance for your tenancy.

Tab 11
Questions

Questions landlords ask us most.

Can’t see your question? Call us on 020 3386 1854.

For most private tenancies in England, yes. The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require landlords to have the fixed electrical installation inspected and tested at least every five years and to give copies of the report to tenants.

Up to five years, but the inspector can recommend a shorter interval if the installation’s condition calls for it. Always use the “next inspection” date on the report, not the five-year maximum.

No. A valid report covers the property, not the tenancy. Give each new tenant a copy of the current report before they move in. You only need a new inspection when the existing one expires, or sooner if the report says so.

Any C1, C2 or FI observation must be put right, or investigated, within 28 days, or sooner if the report says so. Once it’s done, get written confirmation from the electrician and send it, with the original report, to your tenant and the local council within 28 days of completion.

An EICR covers the fixed installation, including permanently connected equipment such as an electric shower, extractor fan or hard-wired cooker circuit. Plug-in appliances you supply are covered by PAT testing, which isn’t required by the English regulations but is good practice and required in Scotland.

Most flats and houses take 2–5 hours. Power is switched off for short periods while each circuit is tested, so let tenants know in advance to save work and avoid alarms or freezers being affected.

Keep a written record of every reasonable attempt to arrange access, including dated notices and messages. The regulations recognise that a landlord isn’t in breach if they can show they took all reasonable steps. Our tenant notice template above is a good place to start.

Short-term holiday lets aren’t covered by the 2020 private rented sector regulations because guests don’t have a tenancy. Most insurers, booking platforms and fire risk assessments still expect electrical safety to be shown, and an EICR is the standard way to do that.

Only if it’s still within its stated validity and was carried out to the standard the regulations require, by a qualified and competent person. Many homebuyer reports are older or partial, so if in doubt, book a fresh inspection before letting.

Tab 12
Get a quote

A fixed price, in writing, today.

Tell us about the property and we’ll come back with a written fixed price and available dates. There’s no obligation and no hard sell.

1
Written fixed price before booking
2
Tenant access coordinated for you
3
Report emailed within 48 hours
4
Repairs quoted separately; your choice
Phone
Prefer to talk?
020 3386 1854
Enquiry
Consent
Reply within one working day